St. Clair-Old Weston SmartTrack Station
Part of the SmartTrack Station program, the SCOW GO Station is located between Bloor GO Station and the future Mount Dennis GO Station on the Kitchener line. The redevelopment project will feature two new station buildings, bike parking, two pedestrian tunnels connecting the east and west platforms, and connections from the station to Gunns Road and St. Clair Avenue West.
View projectG20010 Nisutlin Bay Bridge
The project involves the construction of a new two lane seven span bridge approximately 483m long. Building of a trestle bridge is required to facilitate the new bridge construction. Cofferdams will be used to construct each pier. Substructure pier work will consist of installing 8-10 each 1219mm diameter concrete infilled pipe piles. The piles will be capped at the riverbed level and then a pier constructed consisting of a pier footing, 2000mm concrete column and a pier hammerhead cap. Construction of causeways on each side of the bridge is required which will facilitate re-alignment of 1 km of the Alaska Highway. The existing bridge is to be demolished following the completion of the new bridge. The Project delivery has an element of First Nations participation with TTC members and Yukon First Nations (YFN).
View project