Graham Construction & Engineering Inc
Artist's rendering of the proposed St. Clair-Old Weston SmartTrack Station

St. Clair-Old Weston SmartTrack Station

Emissions by Month

Fuel Consumption by Month

Fuel Type
Units
2024-09
2024-10
2024-11
2024-12
2025-01
2025-02
2025-03
2025-04
2025-05
2025-06
2025-07
2025-08
2025-09
2025-10
2025-11
2025-12
2026-01
2026-02
2026-03
DieselL185.61271.11333.52765.13636.23381.3150.1462.41723.94209.78664.620010.957976.435267.616120.33279.911161.09905.5
Motor GasolineL54.0900.015.06.074.0357.03689.5993.5

Material Purchases by Month

Material
Units
2025-01
2025-02
2025-03
2025-04
2025-05
2025-06
2025-07
2025-08
2025-09
2025-10
2025-11
2025-12
2026-01
2026-02
2026-03
Concrete191.024.021.0
Masonrykg
Steelkg80536.16259.18486.111952.2
Aluminumkg
Woodkg3143.425551.834342.438246.9
Wallboardkg
Glasskg
Tilekg
Asphaltkg

Daily Water Discharge (m³)

Date
Dust Control
Total Discharged
9/29/20253.03.0
10/6/20253.03.0
10/14/20253.03.0
10/20/20253.03.0
11/3/20253.03.0
11/10/20251.01.0
11/17/20252.02.0
11/24/20253.03.0
12/1/20252.02.0

Additional Disclosures

Units
2025-05
2025-06
2025-07
2025-08
2025-09
2025-10
2025-11
2025-12
2026-01
2026-02
2026-03
Total Diverted Wastet10.119.910.715.222.3
Total Wastet11.224.112.617.325.8
Total Landfilled Wastet1.10.04.21.92.13.50.00.00.00.00.0
Waste Diverted%90.082.785.087.786.3